Rafa Ramirez
Activities on the team maintained crags
------------------------ENGLISH----------------------
Majorca Rebolting Project stems from the need to obtain funds to re-bolting routes with the best possible materials. Since the island suffers from corrrosion and the stainless steel anchoring has demostrated to be very little trustworthy, we have decided to re-bolting with titanium and the best quality resin ( Hilti Re-500). Although the materials are very expensive, each titanium anchor costs about 10€ and the resin bottle 40€, we hope it lasts perpetually, only affecting quality and duration of the resin ( that's why we choose the best) and the wear of the rope.
We hope to use this platform to obtain funds, to re-bolting the routes that need it.
A greeting and enjoy the Majorcan rock
-------------------------SPANISH----------------------
Mallorca Rebolting Project es un proyecto que nace de la necesidad de obtener fondos para reequipar las vías con el mejor material posible. Dado que en la isla se padece de corrosión y los anclajes de acero inoxidable han demostrado ser muy poco fiables, hemos optado por reequipar con titanio y resina de la mejor calidad (Hilti Re500). Pero los materiales son muy caros, cada anclaje en titanio ronda alrededor de los 10€ y el bote de resina 40€, lo bueno es que queda a perpetuidad, solo se ve afectado por la calidad y duración de la resina (por eso escojemos la mejor) y el desgaste del roce de la cuerda.
Esperamos usar esta plataforma para obtener fondos para reequipar vías que lo vayan necesitando.
Un saludo y disfrutad de la roca mallorquina